








|
This was a belowgrade Built-up project. The dome section and the Federal Courts building both have a balasted E.P.D.M system with pavers. |
|
Union Station Tacoma WA |
|
Fred Meyer Dist. Ctr. |
|
Annie Wright School |
|
Weynochee Dam |
|
South Center Mall |
|
Regional Justice Ctr. |
|
This was a Single Ply project originally 600,000 Sq. Ft. Until an addition was added in the fall of 1998 bringing the total size to 950,000 Sq. Ft. |
|
This was a Belowgrade waterproof project using Presidential and Celotex products on a 13/12 slope with new copper sheet metal. |
|
This is the Visitor information center. The building is located on a cliff high above a river making this a challenging but attainable new shingle application. |
|
This is a Built-Up project. The building has a modified Built-Up roof system with a new type of roof insulator. |
|
This building has a Built-Up modified roofing system with a 20 year warranty! A Belowgrade waterproofing and deck waterproofing system was employed. Dampproofing of the building was accomplished with a self adhering sheet to all exterior walls above ground level |

